An arena hosting a basketball game in the evening may have held a different event that morning. The conversion between them is among the most practiced operations in American sport.
The floor is a portable object
A basketball court is a modular hardwood floor laid over whatever is underneath, whether that is concrete, an insulated deck or an ice sheet.
Panels are numbered and stored on carts in the order they will be laid. The sequence is fixed, and deviating from it costs far more time than it saves.
Over ice, an insulating layer goes down first. That layer is what allows a hockey surface to survive underneath a basketball game and be ready hours later.
Seating moves as well as flooring
Retractable lower-bowl sections are repositioned for each configuration, since a basketball court and a hockey rink have different footprints.
Those movements are mechanized but require supervision, and they are usually the longest single task in the changeover.
Courtside seating is then built out by hand, including the rows that only exist for basketball and that generate a disproportionate share of ticket revenue.
The crew works to a stopwatch
Changeover crews rehearse and time their sequence, and a fast conversion is a point of professional pride within the industry.
Every member has a numbered role, and the crew size is set so that no one waits on someone else's task to begin their own.
Because the crew is the constraint, arenas schedule two events in a day only when they can staff the conversion fully.
Systems are reconfigured in parallel
Scoreboards, shot clocks, sound systems and lighting scenes are all switched while the floor is being laid, not afterwards.
Baskets are lowered or wheeled into place and then calibrated for height and rim position, which is a measured check rather than a visual one.
Officials inspect the completed floor before the doors open, and their sign-off is what ends the changeover formally.
Why arenas accept the cost
A building with a single tenant sits empty most of the year. Convertibility is what makes a modern arena financially viable.
The cost is a permanent operational burden and a floor that is assembled rather than built, which players and coaches occasionally comment on.
The trade is settled: almost every large American arena is designed for conversion first, and the sports it hosts adapt to that rather than the reverse.