Purpose-built Olympic venues are designed for two weeks of extraordinary demand. Everything that happens to them afterwards follows from the mismatch between that peak and ordinary local use.
Built for a peak that does not recur
Seating capacity, concourse width and parking are specified for full houses at every session. A host city rarely has a resident sport able to fill the same building afterwards.
Technical requirements compound this. Competition pools, velodromes and shooting ranges are built to international specification, which is far beyond what community use requires or can fund.
The result is a building that is both too large and too specialised. Running costs continue whether or not the seats are occupied.
Temporary overlay as the answer
Modern planning splits venues into permanent structure and temporary overlay. The overlay includes upper seating tiers, broadcast compounds, hospitality units and much of the back-of-house accommodation.
Overlay is leased rather than owned, and removed within months of the closing ceremony. What remains is a smaller building matched to whatever demand the city genuinely has.
This approach shifts spending from capital to operations. It costs more per seat during the Games but avoids decades of maintenance on space nobody uses.
Conversion and its limits
Some venues convert well. An arena can host concerts, and a stadium can be reconfigured for a resident football or athletics tenant if the geometry allows.
Others convert badly. Sliding tracks for bobsleigh and luge have almost no alternative use, and their refrigeration and maintenance costs continue regardless of activity.
Conversion also has to be designed at the outset. Retrofitting a venue after the Games is usually more expensive than building the flexibility in from the start.
Who pays afterwards
Operating deficits normally fall to a public body, because few private operators will take on a venue whose costs exceed plausible revenue. Legacy trusts are a common vehicle.
Those trusts are often endowed at handover, which delays rather than removes the problem. When the endowment runs down, the question of subsidy returns.
The clearest predictor of a good outcome is a committed tenant identified before construction. Venues without one tend to struggle whatever the legacy plan promised.
Why hosts now reuse more
Recent bidding has moved decisively towards existing and temporary venues. Hosts are permitted to spread events across a wider area and to use facilities in neighbouring cities.
That reduces construction cost and the risk of stranded assets, at the price of longer travel for spectators and more complex transport planning during the Games.
The change reflects a shift in what a host is judged on. The question has moved from what a city built to what it can still use afterwards.